EDF OS Biomass cogeneration project

9 March 2017

EDF Optimal Solutions gave us the studies, fabrication and installation of thermal piping network in a turnkey contract for their project by Egger plant (88).

We have to achieve detailed studies, 3D model, fabrication and installation of HP, LP steam network, condensates, heating, feedwater and utilities for the connection of boiler, steam turbine generator and site consumers.

http://www.edfoptimalsolutions.fr/notre-actualite/efficacite-energetique-en-industrie.php